November 14, 2024

Eid-Ul-Fitr 2023: Kolkata Traffic Police Announce Restrictions on More Than 80 Roads; Details

Eid Mubarak #EidMubarak

Kolkata: The Kolkata Traffic police have issued a detailed notification in connection with Eid-Ul-Fitr celebrations in the city on Saturday, April 22. The Shawwal Crescent Moon was sighted in Kolkata on Friday hence, Eid will be celebrated tomorrow.

All classes of vehicles and all kinds of traffic including pedestrian traffic shall be regulated.

A) 1) Movements of all types of goods vehicles (except LPG Vehicles, Vegetable, Fruits & Milk carrying vehicles), shall be restricted within the city of Kolkata (Kolkata Police jurisdiction) from 04.00 hrs to 12.00 hrs on Saturday.

2) Goods vehicles for Kolkata Dock System will not be allowed to entry from 04.00 hrs till 12.00 hrs on April 22.

B) Entire Red Road will be closed for all types of vehicular traffic from 22.00 hrs on 21.04.2023 (previous night of the congregation prayer day) till 12.00 hrs on 22.04.2023 or till the end of the programme.

C) Vehicles of all descriptions including Tram Cars will be temporarily suspended or diverted from the following roads and approaches from 04.00 hrs to 12.00 hrs according to the direction of traffic police on duty on Saturday.

1) Manicktala Main Road.

2) Narkeldanga Main Road

3) Gas Street.

4) RG Kar Road.

5) APC Roy Road between Girish Bidyaratna Lane and Kali Shome Street.

6) APC Roy Road between M G Road and Manicktala crossing.

7) MN Chatterjee Street

8) Raja Dinendra Street and Raja Raj Narayan Street crossing.

9) Raja Dinendra Street between Garpar Road and Gas Street

10) North Sealdah Road.

11) Kashinath Dutta Road

12) Khagen Chatterjee Road

13) Lock Gate Road.

14) Indra Biswas Road

15) Gopal Mukherjee Road

16) JK Ghosh Road.

17) Belgachia Road.

18) Federation Street.

19) Beliaghata Rly. Bridge from Bibi Bagan Lane crossing to Palmer Bazar Road crossing.

20) Convent Bridge upto CIT Road crossing and Chatubabu Lane (Full).

22) DC Dey Road.

23) Convent Road.

24) Keshab Ch. Sen Street between A PC Roy Road and Raja Ram Mohan Sarani.

25) MG Road between Rabindra Sarani and College Street.

26) Zakaria Street.

27) Madan Mohan Burman Street.

28) Rabindra Sarani between Canning Street and Tara Chand Dutta Street

29) Colootala Street between Rabindra Sarani and C R Avenue.

30) Lenin Sarani between JL Nehru Road and Hospital Street.

31) CR Avenue between Bentinck Street and Madan Street.

33) JL Nehru Road

34) Rani Rashmoni Avenue between JL Nehru Road and Govt. Place East.

35) Mayo Road between Dufferin Road and Red Road

36) New Road

37) Dufferin Road

38) Park Street between 7 point crossing and AJC Bose Road

39) Beck Bagan Row between AJC Bose Road and Sayed Amir Ali Avenue

40) New CIT Road between Rabindra Sarani and CR Avenue.

41) Sunyat Sen Street between Rabindra Sarani and C R Avenue.

42) Northem Flank of No. 4 Rly. Bridge.

43 Shamsul Huda Road between Rifle Range Road and Jhawtala Road

44) Palm Avenue between Broad Street and Mayfare Road

45) Syed Amir Ali Avenue between Mayfare Road and Beck Bagan Row, western side

46) CIT Road Western flank between Puddapukur and Hatibagan

47) AJC Bose Road between Ripon Street and Sarat Bose Road.

48) Ahiripukur Road

49) Rifle Range Road

50) Biresh Guha Street.

51) Sambhu Nath Pandit Street.

52) Gopal Nagar Road

53) Tollygunge Circular Road

54) Peary Mohan Roy Road

55) Garden Reach Road from Ram Nagar crossing to Sreeram Jute Mill

56) Watgunge Street from C G R Road to GR Road.

57) Western Channel of CIT Road (Paddapukur).

58) Khidderpore Road

59) Outram Road

60) Hospital Road

61) Sambbunath Pandit Street

62) Harish Mukherjee Street

63) CGR Road from Satya Doctor Road crossing upto Khidderpore Bridge

64) Paharpur Road from Mudiali upto Garden Reach Road crossing.

65) Ekbalpore Road from its crossing of Ibrahim Road upto B K Road

66) Ekbalpore Lane from the crossing of Ibrahim Road upto BK Road

67) Braun Field Row from its crossing with DH Road upto Hossain Shah Park

69) MM Ali Road from its crossing with Dr. Sudhir Bose Road upto Ekbalpore Road

70) Mominpore Road from its crossing with Mayurbhanj Road to Ekbalpore Lane

71) Alipore Park Road between Raja Santosh Road and Burdwan Road

72) Dr. Abdul Kader Road

73) Akra Road, Railway Line Road, Bediadanga Road and Selimpur Road

74) Haltu Main Road and Bose Pukur Road

75) Topsia Road from C N Roy Road crossing, north bound.

76) Kustia Road from Picnic Garden Road crossing, north bound.

77) Masjid Bari Lane from Tiljala Road crossing, east bound.

78) Topsia Road (East).

79) Lenin Road.

80) G. R. Road from Ramnagar crossing upto Kesoram Cotton Mills.

81) In front of 166C, SP Mukherjee Road.

D) As the Bus Stand at Esplanade Complex will in no way be disturbed, the temporary removal will not be necessary. Entry will be via New Road, Dufferin Road and Exit will be via R R Avenue/ Tram track etc, to avoid conflict between pedestrians and buses.

E) Movement of Tram Cars on Lenin Sarani and Rafi Ahmed Kidwai Road will be temporarily suspended from 04.00 hrs to 12.00 hrs or as and when considered necessary on the day (22.04.2023). F) Vehicular traffic may also be diverted from any of the arterial and / or feeder roads by the

“These Notifications will be enforced in addition to the other normal restrictions on the day, which are not repugnant to the above,” the traffic notification added.

Leave a Reply